Export
Turtle RDF/XML JSON-LD N-Triples

ssc6.3 implementing planned changes to the eoms unisri 24 25.
ni

IRI: http://www.ontoqa4ed.org/ontologies/ISO-EOSM-University#SSC6.3_ImplementingPlanned_ChangesToTheEOMS_UNISRI_24_25.

miiopr indicator
None
The organization makes changes to the SMOP in a planned and systematic manner through documented change management procedures, with each change recorded in official logs and verified for effectiveness through a dashboard or management report. Indicators of Evidence: SMOP change procedures, change logs, monitoring dashboards, periodic evaluation reports
en
url
https://docs.google.com/document/d/1BpBFJx9qMboT7SSOObX1T990XtxayZg0?rtpof=true&usp=drive_fs
https://drive.google.com/open?id=1zsax7vFLyz-o4rbv-MxXMGPEtIHYvHI7&usp=drive_fs
miirequirement
Where the organization determines the need for changes to the EOMS, the changes shall be carried out in a planned manner (see 4.4)
en
miicode
6.3
miievidence type
Change management procedures, change plans, and system change records
en
← Back to full documentation