[
  {
    "@id": "http://www.ontoqa4ed.org/ontologies/ISO-EOSM-University#SSC5.3.f_EnsuringEOMSIntegrityDuringChanges_UNISRI_24_25",
    "@type": [
      "http://www.ontoqa4ed.org/ontologies/ISO-EOSM-University#SubSubClause",
      "http://www.w3.org/2002/07/owl#NamedIndividual"
    ],
    "http://www.ontoqa4ed.org/ontologies/ISO-EOSM-University#MIICode": [
      {
        "@value": "5.3 .f"
      }
    ],
    "http://www.ontoqa4ed.org/ontologies/ISO-EOSM-University#MIIEvidenceType": [
      {
        "@language": "en",
        "@value": "Change management records, documented procedures for change control, and system update records"
      }
    ],
    "http://www.ontoqa4ed.org/ontologies/ISO-EOSM-University#MIIOprIndicator": [
      {
        "@language": "id",
        "@value": "Memastikan bahwa integritas SMOP dipertahankan ketika perubahan direncanakan dan diimplementasikan melalui prosedur manajemen perubahan berbasis risiko, analisis dampak terdokumentasi, persetujuan pimpinan, dan evaluasi efektivitas perubahan maksimal 6 bulan setelah implementasi."
      },
      {
        "@language": "en",
        "@value": "Ensure that the integrity of the SMOP is maintained when changes are planned and implemented through risk-based change management procedures, documented impact analysis, leadership approval, and evaluation of change effectiveness a maximum of 6 months after implementation"
      }
    ],
    "http://www.ontoqa4ed.org/ontologies/ISO-EOSM-University#MIIRequirement": [
      {
        "@language": "en",
        "@value": "Ensuring that the integrity of the EOMS is maintained when changes to the EOMS are planned and implemented"
      }
    ],
    "http://www.ontoqa4ed.org/ontologies/ISO-EOSM-University#URL": [
      {
        "@type": "http://www.w3.org/2001/XMLSchema#anyURI",
        "@value": "https://drive.google.com/open?id=18ibxT8vaQgyOFX5Ir5IsDaSyqd9rN3XS&usp=drive_fs"
      }
    ]
  }
]