Export
Turtle RDF/XML JSON-LD N-Triples

ssc5.3.f ensuring eomsintegrity during changes unisri 24 25
ni

IRI: http://www.ontoqa4ed.org/ontologies/ISO-EOSM-University#SSC5.3.f_EnsuringEOMSIntegrityDuringChanges_UNISRI_24_25

miirequirement
Ensuring that the integrity of the EOMS is maintained when changes to the EOMS are planned and implemented
en
miiopr indicator
Ensure that the integrity of the SMOP is maintained when changes are planned and implemented through risk-based change management procedures, documented impact analysis, leadership approval, and evaluation of change effectiveness a maximum of 6 months after implementation
en
None
url
https://drive.google.com/open?id=18ibxT8vaQgyOFX5Ir5IsDaSyqd9rN3XS&usp=drive_fs
miievidence type
Change management records, documented procedures for change control, and system update records
en
miicode
5.3 .f
← Back to full documentation