Export
Turtle RDF/XML JSON-LD N-Triples

ssc5.1.1.c integrating eomsrequirements into business processes unisri 24 25.
ni

IRI: http://www.ontoqa4ed.org/ontologies/ISO-EOSM-University#SSC5.1.1.c_IntegratingEOMSRequirementsIntoBusinessProcesses_UNISRI_24_25.

url
https://docs.google.com/spreadsheets/d/1c8kzmIrYTlaevDvf7e9RFVwTGrZOoeo1?rtpof=true&usp=drive_fs
miiopr indicator
The SMOP requirements are integrated in the process map (core, support, management) with process KPIs and evaluation through internal audits at least 1 time per year.
en
None
miievidence type
Process maps, documented procedures incorporating EOMS requirements, and business process documentation
en
miicode
5.1.1.c
miirequirement
Ensuring the integration of the EOMS requirements into the organization’s business processes
en
← Back to full documentation